loading

How to Determine Slurry Pump Flow Rate

Follow these three key instructions to determine the flow rate:

  1. If the production process specifies minimum, normal, and maximum flow rates, use the maximum flow rate as the benchmark.
  2. If only the normal flow rate is given, allocate a margin:
  • For high-flow, low-head pumps (ns > 100), allow a 5% margin.
  • For low-flow, high-head pumps (ns < 50), allow 10%.
  • For pumps with 50 <000000>le; ns <000000>le; 100, use a 5% margin. Increase to 10% for poor-quality pumps or harsh conditions.
  1. Convert weight-based flow rates to volumetric flow rates if necessary.

Accurate flow rate determination improves operational efficiency.

prev.
Common faults and solutions of abrasion resistant and explosion proof mining multistage pumps
Precautions for Operating Slurry Pumps
Kolejny
Zalecane dla Ciebie
brak danych
Skontaktuj się z nami
Gotowy do pracy z nami?

Nasz profesjonalny zespół pomp glurry jest zawsze w twoich usługach.

Jesteśmy zaangażowani w produkcję i produkcję wytrzymałości i ciężkich pomp zawiesinowych i części zamiennych
Każdy produkt CNSME zawiera obietnicę branżową, aby przetrwać lata wspomnień
Bezpieczna, szybka i na czas dostawa
brak danych
Skontaktuj się z nami

Kontakt: Pani Serena Zhang

Tel: +86 13333119820

E-mail: sales@cnsmepump.com 

WhatsApp: +86 13333119820

Dodaj:  260# West Huaian Road, Shijiazhuang, Hebei, Chiny. 050051.

Pobierz
Copyright © 2025 Shijiazhuang Minerals Equipment Co., Ltd  | Mapa witryny

Wyślij zapytanie

弹窗效果
Customer service
detect