loading

How to Determine Slurry Pump Flow Rate

Follow these three key instructions to determine the flow rate:

  1. If the production process specifies minimum, normal, and maximum flow rates, use the maximum flow rate as the benchmark.
  2. If only the normal flow rate is given, allocate a margin:
  • For high-flow, low-head pumps (ns > 100), allow a 5% margin.
  • For low-flow, high-head pumps (ns < 50), allow 10%.
  • For pumps with 50 <000000>le; ns <000000>le; 100, use a 5% margin. Increase to 10% for poor-quality pumps or harsh conditions.
  1. Convert weight-based flow rates to volumetric flow rates if necessary.

Accurate flow rate determination improves operational efficiency.

Prev
Common faults and solutions of abrasion resistant and explosion proof mining multistage pumps
Precautions for Operating Slurry Pumps
Il prossimo
Consigliato per te
nessun dato
Mettersi in contatto con noi
Pronto a lavorare con noi?

Il nostro team di pompa di liquame professionale è sempre ai tuoi servizi.

Siamo impegnati nella produzione e nella produzione di pompe e pezzi di ricambio pesanti e gravi da servizio
Ogni prodotto CNSME viene fornito con una promessa di industria a meteorologi di anni di ricordi
Consegna sicura, veloce e puntuale
nessun dato
Contattaci

Contatto: Ms.Serena Zhang

Tel:86 13333119820

Muslimate mail: sales@cnsmepump.com 

Whatsapp: +86 13333119820

Aggiungi:  260# West Huaian Road, Shijiazhuang, Hebei, Cina. 050051.

Scaricare
Copyright © 2025 Shijiazhuang Minerals Equipment Co., Ltd  | Mappa del sito

Invia la tua richiesta

弹窗效果
Customer service
detect